PROJECT STATS

  • Contract Value: $36,000
  • Man-Hours: 489
  • Superintendent: Alan Shupe
  • Project Manager: Alex Howell
  • 性虐天堂. Newport News, VA

性虐天堂 This Project

性虐天堂 recently completed an insulation project at HRSD鈥檚 Williamsburg Treatment facility Odor Station A. This station has several pipe sizes from 3鈥 to 16鈥 diameter located outside that needed to be electrically heat traced and insulated to prevent the water and vapors inside from freezing. 性虐天堂 coordinated with the electrical contractor who was installing the heat tracing. We determined that the most appropriate insulation system would incorporate using a one (1) inch thick closed cell Armaflex foam rubber insulation and an outdoor rated PVC jacket for weather protection. The project started at the end of October and needed to be finished by the end of November, before freezing temperatures set in.

The project was completed ahead of schedule and the system is operating as designed. This was another in a long line of successful insulation projects that 性虐天堂 has completed for HRSD over the years.

Thanks to 性虐天堂 and the other contractors, the people of Williamsburg and the surrounding area are now benefitting from the new control system at Odor Station A.